Hi,
A Hour is 3600 seconds.
if a team can clean 450 m*m in a hour then
3600/450 = 8 seconds for each m*m
there is 1000 m*m to clean so,
1000*8 = 8000, takes 8k seconds.
8000/3600 = number of hours = 2
8000- (3600*2) = 1600 seconds remainder= 26 minutes
1600- (26*60) = 40 second.
time to work is: 02:26:40
hourly payment?
80.00 / (8000.00/3600.00) , total cost / number of hours
approximantly $36 for per hour.
This problem did a primary school nostalgia in the evening time.. ;))
Ali
A Hour is 3600 seconds.
if a team can clean 450 m*m in a hour then
3600/450 = 8 seconds for each m*m
there is 1000 m*m to clean so,
1000*8 = 8000, takes 8k seconds.
8000/3600 = number of hours = 2
8000- (3600*2) = 1600 seconds remainder= 26 minutes
1600- (26*60) = 40 second.
time to work is: 02:26:40
hourly payment?
80.00 / (8000.00/3600.00) , total cost / number of hours
approximantly $36 for per hour.
This problem did a primary school nostalgia in the evening time.. ;))
Ali
> I have a problem:
>
> A team clean e.g. 450 square meters ( or feets ) for the matter
> in ONE hour
>
> This team must clean 1000 square meters.
>
> The whole work cost e.g. 80 $
>
> How to calculate the work hours and the hourly rate??
>
>
> Always TIA
>
> Arnaldo
>